This Old House Episode Guide

All Episodes (735)

Weston Project
Original Airdate: 2009-01-17

Synopsis:

Adding sod, a bocce court and irrigation system; rustic granite hearthstone for the fireplace; laying handmade tile over the sinks.

Weston Project
Original Airdate: 2009-01-10

Synopsis:

Installing a berm and fence in the front yard; concrete countertops and sink; split-type air conditioning system.

Weston Project
Original Airdate: 2009-01-03

Synopsis:

Installing porous pavers in the driveway; installing window trim; installing the industrial steel staircase.

Weston Project
Original Airdate: 2008-12-27

Synopsis:

Land's Sake Farm; composite decking; cladding a wall in reclaimed galvanized metal; neutral paint color palette.

Weston Project
Original Airdate: 2008-12-20

Synopsis:

Installing granite steps, precast footings and Goshen stone; installing rough sawn and reclaimed white oak flooring.

Weston Project
Original Airdate: 2008-12-13

Synopsis:

Solar panels; installing red distressed vertical boards; timberframer carves 2008 into Douglas fir timber.

Weston Project
Original Airdate: 2008-12-06

Synopsis:

Solar hot-water system; installing Home Slicker and prestained cedar shingles; prepping a shower stall for tile.

Weston Project
Original Airdate: 2008-11-29

Synopsis:

Synthetic slate roofing material; New England fieldstone natural stone veneer; custom wainscoting, chair rail and horizontal wallboards.

Weston Project
Original Airdate: 2008-11-22

Synopsis:

Roof panels; cupola; shingles; copper roof; window installation.

Weston Project
Original Airdate: 2008-11-15

Synopsis:

Water-supply lines and drainage pipes; landscape plan; rain garden; scarf joint.

Weston Project
Original Airdate: 2008-11-08

Synopsis:

Timber frame; custom kitchen; exterior walls.

Weston Project
Original Airdate: 2008-11-01

Synopsis:

Mechanical room module; floor panels; radiant heating and insulation.

Weston Project
Original Airdate: 2008-10-25

Synopsis:

Prefabricating interior and exterior wall systems; Douglas fir and live oak timbers frame the dining area.

Weston Project
Original Airdate: 2008-10-18

Synopsis:

Setting the pre-cast foundation walls; timber frame office; pouring the slab for the basement and garage floor.

ADVERTISEMENT
Premiered: Oct 01, 1980
Next Episode: December 01, 2009
New WHUT
12:00 PM

Installing pre-hung Douglas fir exterior door; removing bookshelves and plaster wall to gain entry into the new library addition.

Tue. Dec 01

TV Listings


Around the Web >>>